Atmos Energy arrived this morning to install the gas line to our house. They located the water line they had to cross and have the line installed by quiting time. Monday they will install the meter.
At the same time, Xcell Energy was installing the underground electric lines to our house.
The installation of the insulation continued today. To reach the higher places they used the stilts. Very interesting! Then they got into the attic and sprayed the rafters.
After the Insulation dries the excess is trimmed exposing the holes that will be filled and trimmed again. The pile of excess is from the entire room not just that corner.
No comments:
Post a Comment