Today the walls of the basement were trenched and poured. The trencher digs a 9" wide trench, 11' 6" deep. Rebar was added to the walls and corners. I was amazed at the amount of concrete used. Thirty yards in the walls alone. The walls will dry 5-6 days then the dirt removed so the floor can be poured. Hollye, Cade and Lanny came to watch the excitement.
More later, Gary
Very COOL! I can't wait to see it. Maybe tomorrow.
ReplyDelete