Friday, July 3, 2009

Final roof framing


Lalo is checking braces on the roof framing.



Same picture just zoomed in.



The crew quit about noon and headed to Lubbock. Happy July 4!!!!!

Thursday, July 2, 2009

Rafters up


Today the final rafters were put up. Three men in the air and three on the ground. Comanche was always at the highest peak walking, lifting and nailing all day long.



Putting rafters over our bedroom and bath.


Comanche on top again.
I am standing in the attic holding on to a rafter to take this picture.


All the rafters are up. I have learned this roof is an eight pitch.



The rafters will need braced, which will be added in the morning. Plans are to stop around noon for a great July 4th weekend!!





Wednesday, July 1, 2009

Roof constructions


Yesterday afternoon and this morning the ceiling joist were put up. I didn't get any pictures of that part of the construction.

Now we can start on the rafters.

Look what arrived!!!!!


This morning we went to Lubbock to take care of a list of stops that had added up. One of them was to watch Abbye as she took a swimming lesson. That was lots of fun. Abbye might be part fish!!! Hollye will post pictures soon! We made most of our stops and arrived in Muleshoe just in time for church. We left church and hurried to see what was accomplished today.

WOW !!

This is the front.


I then started walking around the house.











Do you think they walk this ramp carrying wood to the top? I plan on being there tomorrow to see.


This is the garage side of the house.


More to come......

Tuesday, June 30, 2009

Walls & Joist


Today there was alot of work that was very visible and very tiring.
Lalo was off and on the top of the wall all afternoon.



Measuring where the joist will be.


Lalo's number one man was on the walls most of the morning and all of the afternoon. I never saw him come down until 6:30. He would measure and holler at a man on the ground, who would measure, cut, and lift the boards into the air. I am sure they were tired tonight. The tool belts the wear all day are heavy.




Tonight it got dark before I was able to take pictures of the joist. I'll try to post more pictures tomorrow.

Monday, June 29, 2009

Framing Day # 2

The Boom Box worked all day long! 99% of the walls are up. The walls will be finished tomorrow and the ceiling joust and rafters will began tomorrow. I will take more pictures as the apperance changes. Today was lots of cutting and nailing.

Framing the house

First things first. We have a electric air compressor, Air nailers, saws, hammers, nails, Microwave and most important----- Boom Box!!!!


Now the Framing can start.





The first wall.


We watched the first nails on the outside walls.





Just before the north wall was raised.


One days work.







Framing is fast and shows lots of progress.


Thursday, June 25, 2009

Slab !!!!!!!!!!!

All the rebar and anchors are in place.

Men and concrete trucks arrive to begin.

The slab required 51/2 trucks.







98 degrees-- hot work
We had a surprise as we watched the concrete work.
Lumber arrived!!!


Something new for me, Watering Concrete!


Maybe the concrete will not dry too fast.



Time to go home.